Welcome to Haiyue Techology Group !
CH
Home
Company
Group
Team
Base
Culture
Service
Honor
Products
Product
After sale
Engineering
News
Industry
Notice
Domestic And Foreign
Video
Message
Contact
Case
Bijie North Bus Station Project
2018-11-07
Located in the North Bus Station of Bijie City, Guizhou Province, the total construction area of the project is 2,100 square meters. The equipment area covers an area of 500 square meters. It consists of 15 vertical circulation garages, 4 of which are 10 parking spaces and 11 of which are 12 Parking spaces, a total of 172 parking spaces.
Guiyang Nanming Public Security Bureau Project
Located in the Public Security Bureau of Nanming District, Guiyang City, the project consists of three sets of seven-level vertical circulation parking equipment and a set of six-level lifting and traversing parking equipment. There are 66 parking spaces, using push-button + IC card or ID card storage. Pick up the car, do not need to reverse, turn around and other actions, the owner can leave the car after the car entrance and exit.
Guiyang Karst Guoxi Center I Project
Located in Guoxi Center, Guanshanhu District, Guiyang City, the project mainly consists of two-level lifting and traversing parking equipment. Due to the different sizes, the equipment is equipped with two types of parking spaces, with a total of 428 mechanical parking spaces. 3,900 square meters.
Guiyang Surveying and Mapping Institute Jinyang New District Office Building Project
The total construction area of the project is 3011 square meters, of which parking equipment covers an area of 1040 square meters. The project is mainly composed of two-level lifting and traversing parking equipment, and 115 parking spaces are realized, which greatly meets the personnel of Guiyang City Surveying and Mapping Institute. Parking demand.
Guiyang Shuanglong Yujing New City Project
The project is located at Erfu Road, Longdongbao, Nanming District, Guiyang City. It covers an area of 6,700 square meters. The project consists of two layers of lifting and traversing parking equipment. After the project is completed, it has 794 parking spaces, which is a good solution for nearby people. Parking problems with large traffic and traffic flow.
Zhenning Hongqihu Project
The project is composed of 4floor Plane-moving Parking System.It can provide 68 ordinary car parking spaces, 68 SUV parking spaces, 17 ground SUV parking spaces and 6 outdoor bus parking spaces, covering an area of 835 square meters.